Previous Page Index Next Page

Explore the case study with these controls.

Supply Train

The contract required longtitudinally welded pipes which called for larger than normal steel plates as the raw materials. These plates were manufactured for us in Germany and then shipped to Holland for fabrication into the required specification pipes.