Previous Page Index Next Page

Explore the case study with these controls.

Internal Fabrication

The piles required several thousand internal sheer keys, designed to transfer the load-bearing to the sea bed, to be fitted. Our specialist fabrication crews fitted these as well as steel excavation guides, prior to transfer to the floating barges.