SCHEDULE OF MAJOR WORKS

PROJECT MANAGED BY

THE CURRENT DIRECTORS

AND STAFF OF

UNIVERSAL STEELS (SCOTLAND) LIMITED

 

 

SECOND CROSSING OF THE RIVER TAGUS - LISBON

 

THE VASCO DE GAMA BRIDGE

 

INITIALLY FOR                                          -            Trafalgar House Major Projects

 

ESTIMATION OF COSTS TO PRODUCE TUBULAR PILES

 

2200 O/D x various W/T 128 metres long

 

Each Piece Weight 140 tonnes

 

Quantity 900 No

 

ESTIMATION OF COST TO LAY OUT AND PROCURE ALL PLANT AND EQUIPMENT NECESSARY TO PROCESS AND FABRICATE

 

170,000 tonnes Steel Reinforcement

 

FINALLY TO PRODUCE FABRICATE SHIP AND LOAD OUT

 

55000 tonnes Steel Tubular Piles 1700 mm O/D x 22 mm W/T

 

In Continuous Length of 98,000 mm

 

 

 

 


2

 

 

 

 

 

 

CONTAINER TERMINAL PHASE II - GRAND BAHAMA

 

CONTRACTOR               -                        Costain Construction Limited

 

Production, Protective Coating and Fabrication of Combi-Wall Piling System

 

1220 mm O/D - Larssen LX 32

 

QUANTITY                      -                        2600.00 tonnes

 

DELIVERY                       -                        Direct by sea

 

 

POINT DE GREIVES CONTAINER TERMINAL - MARTINIQUE

 

CONTRACTOR               -                        Bougyes Construction

 

Production and supply of Spiral Welding Plant and equipment 7000 tonnes

 

 

HEATHROW EXPRESS RAIL LINK

 

CONTRACTOR               -                        Balfour Beatty Constructions

 

Procurement and Fabrication of Heavy Tunnel opening sets

 

4000 tons

 

 


3

 

 

 

 

MARATHON OIL, "BRAE A" PRODUCTION PLATFORM

 

CLIENT                                MARATHON OIL UK LIMITED

 

ENGINEER                           CJB, LONDON

 

FABRICATORS                     (a)       McDermott                          -         Inverness, Scotland

 

                                           (b)       Dragados                           -         Cadiz, Spain      

 

                                           (c)       De Groot                            -         Rotterdam, Holland

 

SCOPE                                The production, quality management and transportation by road

                                           and sea to all fabricators of:-

 

SEAMLESS STEEL TUBULARS        4,500 tons

 

STEEL PLATE                                                            2,500 tons

 

ROLLED STEEL SECTIONS   4,000 tons

 

 

BRITISH GAS - MORECAMBE BAY DEVELOPMENT

 

FABRICATOR                       Haverton Hill Fabricators

 

SUPPLY                               3,500 tons Section, Plate, RHS, Seamless Tubulars

 

 

BRITISH GAS - ROUGH GAS STORAGE

 

FABRICATOR                       SLP Lowestoft

 

SUPPLY                               2,800 tons Section, Plate, Seamless Steel Tube

 

 

CHEVRON PETROLEUM

 

NINIAN NORTHERN PLATFORM

 

SUPPLY                               2400 tons Section, Plate, Tube


4

 

 

PHILIPS PETROLEUM

 

PHILIPS "MAUREEN" WELL HEAD TEMPLATE

 

FABRICATOR                       Weldit

 

SUPPLY                               7,000 tons steel plate

 

 

CONOCO TENSION LEG PLATFORM (TLP)

 

TLP TRUSS STRUCTURE

 

SUPPLY                               Fabricated steel tubular sections - 5000 tons

 

DELIVERED                          By road and sea

 

FABRICATORS                     (a)       McDermott                          -         Inverness, Scotland

                                          

                                           (b)       Kestral Marine        -            Dundee, Scotland

 

                                           (c)       Dragados                           -         Cadiz, Spain

 

 

MUSSELBOROUGH BY-PASS

 

MAIN CONTRACTOR                                -            Tarmac

 

Supply 2000 tonnes of Universal Bearing Piles 26-33000 mm in length

 

 

CLYDE SUBMARINE BASE - FASLANE

 

MAIN CONTRACTOR            -         Tarmac

 

Supply 1000 tonnes of Universal Bearing Piles 30,000 mm in length

 

 

CLYDE SUBMARINE BASE - FASLANE

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate, Paint and Supply 1300 tonnes of Steel Tubular Piles

 

Length Range                        -         26-38,000 mm long

 


5

 

CALEDONIAN PAPER MILL

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Supply 2300 tonnes Tubular Piles

 

Length Range                        -         25-33,000 mm long

 

HAVERINGORE BRIDGE

 

MAIN CONTRACTOR            -         Tarmac

 

Supply Part Coated 1000 tonnes of Tubular Piles 26,000 mm long

 

 

ROYAL NAVAL ARMAMENTS DEPOT - CROMBIE

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate, Paint and Supply 10,000 tonnes of Steel Tubular Piles

 

Length Range                        -         65-98,000 mm long

 

 

A94 ABERDEEN TRUNK ROAD

 

MAIN CONTRACTOR            -         Miller Construction

 

Fabricate and Erect 2 Road Bridges 700 tonnes

 

 

NEWCASTLE WESTERN BY-PASS - PHASE II

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Supply 4200 tonnes of Universal Bearing Pile

 

Length up to                          -         30,000

 

 

NEWCASTLE WESTERN BY-PASS - PHASE III

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Fabricate and Erect 3 No Road Bridges - 1200 tonnes

 

Supply 2000 tonnes Universal Bearing Piles


6

 

 

 

 

 

NEW CONTAINER TERMINAL - ISLE OF GRAIN

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate and Supply 8000 tonnes Steel Tubular Piles

 

Length                                  -         50,000 mm

 

 

OLYMPIA AND YORK - CANARY WHARF DEVELOPMENT

 

MAIN CONTRACTOR            -         Lehrer McGovern - Bovis

 

Fabricate and Supply 28,000 tonnes Steel Tubular Piles

 

Length                                  -         28,000 mm long

 

 

DOCKLAND LIGHT RAILWAY EXTENSION - MONUMENT STATION

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Fabricate, Paint, Supply and Erect 1200 tonnes Structural Steel Work for Re-Development of Monument Underground Station

 

 

M63 MOTORWAY WIDENING

 

MAIN CONTRACTOR            -         Amec Civil Engineering

 

Supply 3500 tonnes Universal Bearing Piles

 

 

DARTFORD INTERNATIONAL FERRY TERMINAL

 

MAIN CONTRACTOR            -         John Howard

 

Fabricate and Supply 16 Dolphin Piles 90 tonnes each plus Bridges Platforms and Fender System

 

Length                                  -         40,000 mm

 


7

 

 

 

 

 

REMOVAL AND RE-ERECTION OF "PRIMROSE STREET BRIDGE" BROADGATE

 

MAIN CONTRACTOR            -         Amec Civil Engineering

 

Fabricate and Erect at Liverpool Street Station during BR

 

Possession Hours 700 tonnes Heavy Structural Steelwork

 

Assemble New Structure and Launch out under jacked up existing structure 600 tonnes

 

 

DUNBLANE BY-PASS

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Process and Supply 2500 tonnes Steel Reinforcement

 

 

CANARY WHARF DEVELOPMENT

 

MAIN CONTRACTOR            -         Christiani and Neilsen

 

Process and Supply 15,000 tonnes Steel Reinforcement

 

Pre-Fabricate Pile and Beam Cages - Tilbury

 

Supply by Barge, Receive at Canary Wharf and fix Insitu

 

 

A406 NORTH CIRCULAR ROAD - LONDON

 

PRINCIPAL SUB CONTRACTORS   -   Cementation Foundations/Stent Foundations

 

Process and Supply 3000 tonnes of Steel Reinforcement


8

 

 

 

LONDON DOCKLANDS DEVELOPMENT CORPORATION - LIMEHOUSE LINK PROJECT

 

MAIN CONTRACTOR            -         Balfour Beatty Amec - Joint Venture

 

Process and Supply by Water            75,000 tonnes Steel Reinforcement

 

Fabricate and Supply be Water           4,500 tonnes Tubular Piles

Supply                                                                  3,000 tonnes Steel Sheet Piles

Supply                                                                  2,200 tonnes Steel Section

 

 

A55 COAST ROAD - CONWAY CROSSING

 

MAIN CONTRACTOR            -         Costain/Tarmac - Joint Venture

 

Supply 2,500 tonnes Steel Plate - Main Tunnel Lining

 

 

M74 UPGRADED TO MOTORWAY STANDARD

 

MAIN CONTRACTOR            -         Shanks and McEwan Limited

 

Supply 6000 tonnes Steel Reinforcement

 

 

IRVINES QUAY DEVELOPMENT - HARTLEPOOL

 

MAIN CONTRACTOR            -         Birse Construction

 

Supply                                 3000 tonnes    -            Tubular Piles

                                           1500 tonnes    -            Steel Reinforcement

                                           1900 tonnes    -            Steel Sheet Piles

                                           2100 tonnes    -            Universal Bearing Piles

 

 

A6 MOUNT SORREL

 

MAIN CONTRACTOR            -         Tarmac Construction

 

Supply 3200 tonnes Steel Reinforcement

 


9

 

 

 

NEW DOCK ENTRANCE - PORT OF BARROW

 

MAIN CONTRACTOR            -         Monk Ballast Nedam

 

Supply and Fix 2500 tonnes Steel Reinforcement

 

 

WANLIP SEWAGE TREATMENT WORKS

 

MAIN CONTRACTOR            -         Taylor Woodrow

 

Supply 2000 tonnes Steel Reinforcement

 

 

NEWCASTLE WESTERN BY-PASS

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Supply 2000 tonnes Steel Reinforcement

 

 

UPGRADING A74

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Supply 1500 tonnes Steel Reinforcement

 

 

THAMES WATER LONDON RING MAIN

 

MAIN CONTRACTOR            -         Amec Tunnelling

 

Fabricate Protective Coat and Install 400 tonnes

 

Steel Tubular Liners - 2500 mm diameter

 

 

JOHNSTONE HOWOOD BY-PASS

 

MAIN CONTRACTOR            -                   Edmund Nuttall Limited

 

Supply 2500 tonnes Steel Reinforcement

 


10

 

 

GLASGOW AND OVERSEAS DEVELOPMENT

 

MAIN CONTRACTOR            -         Laing Management-Lilley

 

Supply 2500 tonnes Universal Bearing Piles

 

Length range                         30-40000 mm

 

LISAHALLY PORT DEVELOPMENT

 

MAIN CONTRACTOR            -         Charles Brand

 

Supply and protectively coat 3500 tonnes Sheet Piles

 

 

M40 MOTORWAY

 

MAIN CONTRACTOR            -         Tarmac

 

Supply 1800 tonnes Universal Bearing Piles

 

 

TEESSDALE DEVELOPMENT - STOCKTON

 

MAIN CONTRACTOR            -         Tarmac

 

Supply and protectively coat   -         4000 tonnes      -    Sheet Piles

                                                                            3000 tonnes -         Universal Bearing Piles

 

 

ABERDEEN HARBOUR BOARD

 

MAIN CONTRACTOR            -         Mowlem

 

Supply                 -               3500 tonnes    -            Steel Sheet Piles

                                           2200 tonnes    -            Universal Bearing Piles

 

 

SANDGATE BEACH DEFENCE

 

MAIN CONTRACTOR            -         Harbour and General

 

Supply  1500 tonnes Steel Section

 


11

 

 

 

DORNI BRIDGE PROJECT

 

MAIN CONTRACTOR            -         Harbour and General

 

Supply 750 tonnes Hi-Star Universal Bearing Piles

 

The first project in the world to accept H1-Star

 

DAWLISH BY PASS

 

MAIN CONTRACTOR            -         Mining and Piling

 

Supply 500 tonnes Universal Bearing Piles

 

 

MINSTER COURT DEVELOPMENT

 

MAIN CONTRACTOR            -         Amec Foundations

 

Supply 400 tonnes Universal Bearing Piles

 

 

MARKS AND SPENCER LISBURN

 

MAIN CONTRACTOR            -         McGloughlan and Harvey

 

Supply                 -               1700 tonnes Steel Sheet Piles

 

Supply                 -               500 tonnes Universal Bearing Piles

 

 

ABERDEEN HARBOUR BOARD MEARNS QUAY

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Supply 850 tonnes Universal Bearing Piles

 

 

DEESIDE RAIL CROSSING

 

MAIN CONTRACTOR            -         Norwest Holst

 

Supply 1000 tonnes Universal Bearing Piles


12

 

A66 INTERCHANGE STOCKTON

 

MAIN CONTRACTOR            -         Birse Construction

 

Supply 3500 tonnes Universal Bearing Piles

 

 

GLAXO CHEMICAL MONTROSE

 

MAIN CONTRACTOR            -         Lilley Construction

 

Supply 600 tonnes Universal bearing Piles

 

 

LAURISTON BY PASS

 

MAIN CONTRACTOR            -         Edmund Nuttall

 

Supply 300 tonnes Universal Bearing Piles

 

 

SHEFFIELD LIGHT TRAMWAY

 

MAIN CONTRACTOR            -         Balfour Beatty

 

Supply 500 tonnes Universal Bearing Piles

 

 

MOMBASSA MILITARY PORT

 

MAIN CONTRACTOR            -         Mowlem International

 

Supply 1500 tonnes Steel Tubular Piles

 

 

CARDENDEN VIADUCT PROJECT

 

MAIN CONTRACTOR            -         Gleeson Construction

 

Supply 450 tonnes Steel Section

 

 

SUTTON BRIDGE PROJECT

 

MAIN CONTRACTOR            -         Tilbury Construction

 

Supply 600 tonnes Universal Bearing Piles


13

 

 

SHELLHAVEN PROJECT

 

MAIN CONTRACTOR            -         Costain Construction

 

Fabricate and Supply 550 tonnes High Modulus Piling

 

 

A406 CHINGFORD TO HALE END ROAD

 

MAIN CONTRACTOR            -         Trafalgar House Major Projects

 

Supply 4800 tonnes Steel Tubular Piles

 

Ends full fabricated

 

Length                 -               22,000 - 30,000 mm

 

 

ESSEX WATER

 

MAIN CONTRACTOR            -         Essex Water Authority

 

Supply 2.5 kilometres 1220 mm O/D Water Pipeline

 

 

M63 WIDENING

 

MAIN CONTRACTOR            -         Peter Birse

 

Supply 700 metres 1000 mm O/D Water Pipelines - Associated Fittings

 

 

AMERADA HESS - SCOTT FIELD DEVELOPMENT

 

MAIN CONTRACTOR            -         Stena Offshore

 

Supply 3 No 2000 mm O/D Mooring Dolphins 147.00 tonnes each

 

 

ESSEX WATER

 

MAIN CONTRACTOR            -         Essex Water Authority

 

Supply 5000 metres 1220 mm O/D Water Pipeline - coated and lined

 


14

 

 

 

 

STRATHCLYDE REGIONAL COUNCIL

 

MAIN CONTRACTOR            -         Strathclyde Water Authority

 

Supply 7.5 kilometres 800 mm O/D Water Pipeline and Fittings

 

 

RIVERSIDE QUAY PROJECT

 

MAIN CONTRACTOR            -         Trafalgar House Construction

 

Supply Steel Tubular Piles

 

1200 tonnes          Length       26-34,000 mm

 

 

NORTH QUAY DEVELOPMENT - NEWHAVEN PORT

 

MAIN CONTRACTOR            -         Tilbury Douglas Construction

 

Supply Steel Tubular Piles

 

1000 tonnes          Length       20-25,000 mm

 

 

TAYSIDE REGIONAL COUNCIL WATER DEPARTMENT

 

MAIN CONTRACTOR            -         Lilley Construction

 

Supply 2 kilometres Steel Water Main 1500 mm diameter

 

 

CONVOYS WHARF PROJECTS

 

MAIN CONTRACTOR            -         Tilbury Douglas Construction

 

Supply Steel Tubular Piles

 

1000 tonnes          Length       25,000 mm

 


15

 

BELLVIEW PORT DEVELOPMENT

 

MAIN CONTRACTOR            -         Ascon

 

Supply 3500 tonnes Tubular Piles - Discharge to barge mid-river

 

Length range         30-40000 mm

 

 

A12 - M11 UPGRADE

 

CONTRACTOR                               -         Norwest Holst Limited

 

Design Production and Fabrication of Tubular Props for Diaphragm Wall Support

 

1500 tonnes in length up to 36000 mm

 

 

CROMWELL ROAD RAILWAY BRIDGE

 

CONTRACTOR                                         -            Tillbury Douglas

 

Supply of 750 tonnes Steel Sections - Delivery Only during Night Time Possession Hours

 

 

JUBILEE LINE EXTENSION

 

WESTMINSTER STATION

 

CONTRACTOR                                         -            Balfour Beatty - Amec

 

Fabricate and supply 700 tonnes Structural Steel creating temporary deck over active underground station

 

 

EMERGENCY WATER SUPPLY - MADRID SPAIN

 

Production and supply 1900 mm O/D and 2000 mm O/D Steel Water Pipes 3,500 tonnes involving 5 ships and 596 vehicle movement within Spain

 

 

NORTHFLEET TERMINAL - RIVER THAMES

 

CONTRACTOR                                         -            Keir Construction

 

Supply 800.00 tonnes Tubular Piles


16

 

JUBILEE LINE EXTENSION

 

CANARY WHARF STATION

 

CONTRACTOR                                         -            Tarmac Bachy JV

 

Fabrication and supply by barge heavy tubular props and walings 4000 tonnes

 

 

AMOCO NORTH WEST HUTTON - PRODUCTION PLATFORM

 

CLIENT                                AMCO UK LIMITED

 

ENGINEER                           McDERMOTT ENGINEERING - WEMBLY

 

FABRICATORS                     (a)       McDermott                          -         Inverness, Scotland

 

                                           (b)       Dragados                           -         Cadiz, Spain

 

                                           (c)       De Groot                            -         Rotterdam, Holland

                                          

                                           (d)       Brown and Root                  -         Great Yarmouth, England

 

SCOPE                                The production, quality management and transportation by sea

                                           and road to all fabricators of:-

 

STEEL PLATE                                                            16,000.00 tons

 

STEEL SECTIONS                           4,500.00 tons

 

SEAMLESS STEEL TUBULARS        1,250.00 tons

 

RECTANGULAR AND            600.00 tons

SQUARE HOLLOW SECTION

 

 

YORKSHIRE WATER

 

EMERGENCY WATER MAIN, TEES TO WISK

 

CLIENT                           -                        Yorkshire Water Authority

 

To produce externally coat and line internally for potable water

 

1220 mm O/D Water Main

 

Quantity 5000 tonnes


17

 

 

 

 

ANGLIAN WATER

 

PETERBOROUGH - WING

 

CLIENT                           -                        Anglian Water

 

To produce externally coat with polyentheline and lined for potable water main 26 kilometres 3500.00 tonnes

 

 

SOUTH AMERICA

 

The design, procurement of equipment and lay out of a fully integrated steel water pipe production facility.

 

Supply of 15,000.00 tonnes HR Coil for Sprial Pipe Production

 

 

MILLENNIUM PIER

 

Production and delivery of 2000 mm O/D Steel Tubulars for the construction of the floating millennium pier River Thames - London

 

650.00 tonnes

 

 

GUNWHARF QUAY - PORTSMOUTH

 

CONTRACTOR               -                        Christiani and Nielsen Limited

 

To production and supply of 4000 tonnes Tubular Piles in lengths of 44000 mm by sea

 

 

RINGASKIDDY TERMINAL - CORK

 

CONTRACTOR               -                        Ascon

 

The production of 2500 tonnes Tubular Piles

 

Length                             -                        45000 mm - Delivery by sea


18

 

 

 

 

UNION OIL HELM AND HELDER - PRODUCTION PLATFORMS

 

CLIENT                                UNION OIL, THE NETHERLANDS

 

ENGINEER                           HEEREMA ENGINEERING SERVICES, LEIDEN, HOLLAND

 

FABRICATORS                     (a)       De Groot                -            Rotterdam, Holland

 

                                           (b)       Heerema               -            Flushing, Holland

 

SCOPE                                The production, quality management and transportation by road

                                           to both fabricators of:-

 

SEAMLESS STEEL BRACING 2,200.00 tons

TUBULARS

 

 

AMOCO H & J PRODUCTION PLATFORMS

 

CLIENT                                AMOCO UK LIMITED

 

ENGINEER                           GLOBAL ENGINEERING, WIMBLEDON

 

FABRICATORS                     (a)       Heerema Engineering           -         Flushing, Holland

 

                                           (b)       Lewis Offshore                    -         Stornoway, Scotland

 

SCOPE                                The production, quality management and transportation by road

                                           and sea to both fabricators of:-

 

FABRICATED TUBULAR        6,000 tons

JACKET LEGS

 

FABRICATED TUBULAR        4,000 tons

PILES

 

SEAMLESS STEEL TUBULAR          1,500 tons

BRACING TUBES

 


19

 

 

 

CHANNEL TUNNEL RAIL LINK

 

 

CONTRACT 230 THE STRATFORD BOX

 

SUPPLY AND FABRICATE STEEL TUBULAR PROPS

AND WAILINGS - 4,600.00 TONS

 

MAIN CONTRACTOR - SKANSKA CONSTRUCTION UK LIMITED

 

 

A14 HIGHWAY - PORTUGAL

 

PRODUCTION AND SUPPLY STRUCTURAL STEEL TUBULAR CASINGS

 

1845 O/D x 20 mm W/T - 100 No at 20000 mm

 

MAIN CONTRACTOR - SOARES DA COSTA, PORTUGAL

 

 

REMOTE ARMAMENT FACILITY - RIVER TAMAR

 

SUPPLY FABRICATE AND PROTECTIVELY COAT STEEL TUBULAR PILES

 

QUANTITY                                   1600 tons

 

LENGTH RANGE                          14 - 47000 mm

 

MAIN CONTRACTOR - SKANSKA CONSTRUCTION (UK) LIMITED

 

 

DOVER HARBOUR BOARD

 

BREASTING DOLPHIN TO BERTH 5-6

 

FABRICATION SUPPLY AND CLOSE AT DOVER

 

DOLPHIN PILE                             DIAMETER                  38000 mm

 

                                                 LENGTH                      40000 mm

 

                                                 INDIVIDUAL WEIGHT - 197.00 TONS

 

MAIN CONTRACTOR - MOWLEM MARINE


20

 

SCRABSTER HARBOUR TRUST

 

PRODUCTION / FABRICATION / PROTECTIVE COATING - STEEL TUBULAR PILES

 

LENGTH                                     30 / 44,000 mm

 

WEIGHT                                     4,100.00 tons

 

 

VOSPER THORNECROFT - PORTSMOUTH

 

PRODUCTION AND MARINE SUPPLY / STEEL TUBULAR PILES

 

LENGTH                                     36 - 38000 mm

 

WEIGHT                                     1250.00 tons

 

MAIN CONTRACTOR - AMEC

 

 

SPINNAKER TOWER - PORTSMOUTH

 

PRODUCTION AND MARINE SUPPLY / STEEL TUBULAR PILES

 

LENGTH                                     30 - 32000 mm

 

QUANTITY                                 800.00 tons

 

MAIN CONTRACTOR - MOWLEM PILING LIMITED

 

 

 

 

 


21

 

 

ATLANTIC LNG

 

NORTH TRINIDAD LNG TERMINAL / SUPPLY PLATE AND STRUCTURAL SECTION

 

WEIGHT                                     3000.00 tons

 

CONTRACTOR WHESSOE LIMITED

 

 

DABHOL LNG TANK FARM INDIA

 

SUPPLY STEEL TANK PLATE AND SECTIONS

 

WEIGHT                                     5000.00 tons

 

CONTRACTOR SKANSKA - WHESSOE

 

A13 TRUNK ROAD BRIDGE IMPROVEMENT

 

SUPPLY OF STEEL PLATE

 

WEIGHT                                     5000.00 tons

 

CONTRACTOR - CLEVELAND BRIDGE LIMITED

 

 

GREATER LONDON AUTHORITY

 

NEW CIVIC BUILDING / SUPPLY STRUCTURAL STEEL TUBES

 

WEIGHT                                     850.00 tons

 

CONTRACTOR - WESTCOL LIMITED

 

 

LEICESTER CITY FC

 

NEW STADIUM / SUPPLY STEEL SECTION AND TUBE

 

WEIGHT                                     8500.00 tons

 

CONTRACTOR - WESTCOL LIMITED

 


22

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    B H P PETROLEUM LIMITED

 

DEVELOPMENT                                        LIVERPOOL BAY

 

PROJECT                                                 FABRICATION OF SATELITE STRUCTURES

 

TOTAL MAN HOURS                                782,919

 

 

CLIENT                                                    CONOCO UK LIMITED

 

DEVELOPMENT                                        JUPITER FIELD DEVELOPMENT

 

PROJECT                                                 GANYMEDE DECK, JACKET AND PILES

                                                               LOGGS RECEPTION MODULE

 

TOTAL MAN HOURS                                276,082

 

 

CLIENT                                                    BRITISH PETROLEUM

 

DEVELOPMENT                                        ANDREW FIELD

 

PROJECT                                                 FABRICATION OF JACKET, TEMPLATE AND

                                                               PILES

 

TOTAL MAN HOURS                                515,647


23

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    ASTANAO

 

DEVELOPMENT                                        BP FOINAVEN FIELD

 

PROJECT                                                 FABRICATION MOORING TURRET

 

TOTAL MAN HOURS                                260,923

 

 

CLIENT                                                    BRISTOL PLC AND BP EXPLORATION

 

DEVELOPMENT                                        CLEETON COMPRESSION PLATFORM

 

PROJECT                                                 FABRICATION OF COMPRESSION PLATFORM

 

TOTAL MAN HOURS                                188,065

 

 

CLIENT                                                    BHP PETROLEUM LIMITED

 

DEVELOPMENT                                        LIVERPOOL BAY

 

PROJECT                                                 CALRAM

 

TOTAL MAN HOURS                                113,992

 


24

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    MOBIL

 

DEVELOPMENT                                        GALAHAD

 

PROJECT                                                 MINIMUM FACILITIES MONOPOD PLATFORM

 

TOTAL MAN HOURS                                151,104

 

 

CLIENT                                                    CONOCO UK LIMITED

 

DEVELOPMENT                                        CMS PHASE II OFFSHORE COMPRESSION

                                                               PROJECT

                                                              

PROJECT                                                 FABRICATION OF JACKET, PILES

                                                               COMPRESSION DUCTS, BRIDGE AND MURDOCH

                                                               MODULE

 

TOTAL MAN HOURS                                593,661

 

 

CLIENT                                                    MAERSK OLIE OG GAS AS

 

DEVELOPMENT                                        DAN FF JACKET AND PILES

 

PROJECT                                                 FABRICATION OF WELL HEAD STRUCTURE

 

TOTAL MAN HOURS                                216,457


25

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    BRITISH GAS ARMADA               

 

DEVELOPMENT                                        ARMADA FIELD

 

PROJECT                                                 FABRICATION OF JACKET

 

TOTAL MAN HOURS                                369,509

 

 

CLIENT                                                    BRITISH PETROLEUM

 

DEVELOPMENT                                        SCHIEHALLION

 

PROJECT                                                 F P S O TOPSIDE FABRICATION

 

TOTAL MAN HOURS                                829,940

 

 

CLIENT                                                    ELF EXPLORATION

 

DEVELOPMENT                                        ELGIN - FRANKLIN

 

PROJECT                                                 P U Q PRODUCTION PLATFORM

 

TOTAL MAN HOURS                                9,920,739


26

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    CONOCO     

 

DEVELOPMENT                                        VIKING - PHOENIX

 

PROJECT                                                 FABRICATION OF 2 No PLATFORMS AND

                                                               COMPRESSION MODULES

 

TOTAL MAN HOURS                                295,220

 

 

CLIENT                                                    AMERADA HESS

 

DEVELOPMENT                                        SOUTH ARNE

 

PROJECT                                                 FABRICATION OF INTEGRATED DECK

 

TOTAL MAN HOURS                                1,426,208

 

 

CLIENT                                                    CHEVRON

 

DEVELOPMENT                                        ALBA PHASE IIB

 

PROJECT                                                 FABRICATION OF TOPSIDES (MODULES AND

                                                               P.A.Us)

 

TOTAL MAN HOURS                                369,815


27

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    NORSK HYDRO

 

DEVELOPMENT                                        TROLL C

 

PROJECT                                                 RISER SUPPORT STRUCTURES 2 No

 

TOTAL MAN HOURS                                170,070

 

 

CLIENT                                                    B G

 

DEVELOPMENT                                        ECA (EASINGTON)

 

PROJECT                                                 FABRICATION OF CLEETON AND NEPTUNE

                                                               JACKETS DECKS, PILES AND BRIDGE

 

TOTAL MAN HOURS                                301,000

 

 

CLIENT                                                    D M L

 

DEVELOPMENT                                        D154 DOCK RENOVATIONS

 

PROJECT                                                 D M L AUTOFAB BEAMS

 

TOTAL MAN HOURS                                31,000


28

 

 

 

 

KBR CALEDONIA LIMITED

 

CLIENT                                                    TEXACO      

 

DEVELOPMENT                                        PETRONIUS FIELD

 

PROJECT                                                 FLEXI PILES FOR J RAY McDERMOTT

 

TOTAL MAN HOURS                                25,000

 

 

CLIENT                                                    KVAERNER

 

DEVELOPMENT                                        SABLE ISLAND OFFSHORE ENERGY

 

PROJECT                                                 SABLE ISLAND - PIPE ROLLING

 

TOTAL MAN HOURS                                4,000

 

 

CLIENT                                                    P C L

 

DEVELOPMENT                                        TERRA NOVA

 

PROJECT                                                 FABRICATION OF TOPSIDES MODULES M03

                                                               AND M05

 

TOTAL MAN HOURS                                867,613